Feb 18, 2018 18:10
6 yrs ago
3 viewers *
Spanish term
vía en foso
Spanish to English
Tech/Engineering
Construction / Civil Engineering
Railway construction
Hi all,
Spanish Spanish to UK English.
This is the pricing section for track construction works. Sorry about the caps.
What does it mean by "vía en foso"? It doesn't make any sense to me as it seems to be the last place you'd want to lay a train track.
Thanks for any help.
Suministro de elementos de APOYO Y SUJECIÓN Y MONTAJE DE ******VÍA EN FOSO******* PARA ANCHO RENFE 1668MM O UIC 1435MM, INCLUYENDO TODAS LAS OPERACIONES NECESARIAS HASTA ALCANZAR LAS TOLERANCIAS EXIGIDAS PARA 2ª NIVELACIÓN.
Spanish Spanish to UK English.
This is the pricing section for track construction works. Sorry about the caps.
What does it mean by "vía en foso"? It doesn't make any sense to me as it seems to be the last place you'd want to lay a train track.
Thanks for any help.
Suministro de elementos de APOYO Y SUJECIÓN Y MONTAJE DE ******VÍA EN FOSO******* PARA ANCHO RENFE 1668MM O UIC 1435MM, INCLUYENDO TODAS LAS OPERACIONES NECESARIAS HASTA ALCANZAR LAS TOLERANCIAS EXIGIDAS PARA 2ª NIVELACIÓN.
Proposed translations
(English)
4 +2 | track in trench | MPGS |
4 +1 | track laid over a pit | Peter Guest |
Proposed translations
+2
7 mins
Selected
track in trench
https://www.google.es/search?q="track in trench"&client=fire...
HTH
:-)
--------------------------------------------------
Note added at 16 mins (2018-02-18 18:26:37 GMT)
--------------------------------------------------
Si el terreno no es llano o siéndolo hay otros obstáculos que salvar, el trazado irá hundido en trinchera (o túnel, como caso límite) o elevado sobre un terraplén.
:-)
--------------------------------------------------
Note added at 39 mins (2018-02-18 18:49:10 GMT)
--------------------------------------------------
... terraplén (o puente, como caso límite).
:-)
--------------------------------------------------
Note added at 4 days (2018-02-22 19:07:31 GMT) Post-grading
--------------------------------------------------
gracias a todos
:-)
HTH
:-)
--------------------------------------------------
Note added at 16 mins (2018-02-18 18:26:37 GMT)
--------------------------------------------------
Si el terreno no es llano o siéndolo hay otros obstáculos que salvar, el trazado irá hundido en trinchera (o túnel, como caso límite) o elevado sobre un terraplén.
:-)
--------------------------------------------------
Note added at 39 mins (2018-02-18 18:49:10 GMT)
--------------------------------------------------
... terraplén (o puente, como caso límite).
:-)
--------------------------------------------------
Note added at 4 days (2018-02-22 19:07:31 GMT) Post-grading
--------------------------------------------------
gracias a todos
:-)
Peer comment(s):
agree |
neilmac
3 mins
|
muchas gracias neilmac :-)
|
|
agree |
Elizabeth Joy Pitt de Morales
18 mins
|
muchas gracias Elizabeth :-)
|
4 KudoZ points awarded for this answer.
Comment: "Thanks for the confirmation"
+1
11 mins
track laid over a pit
as in the note. With the context available I'd go for this. It's probably for maintenance of the bogies.
Note from asker:
Hi Peter, thanks for your suggestion, in my case I think it's through open terrain, not a repair yard or anything like that. Appreciate your time. |
Peer comment(s):
agree |
Jennifer Levey
: As here: https://www.forotrenes.com/foro/viewtopic.php?f=9&t=218&star... There's mention of "vía en foso" in an earlier post on the same page, also referring to "Cerro Negro, Madrid".
3 hrs
|